Daily production report format in Excel

One row per machine and shift: target, pieces made, rejected, minutes lost and the reason. A shift that falls short of its target turns red by itself.

Download the Excel file.xlsx · 48 KB · 14 columns · no form, no email

What the file looks like

The heading row and the five example rows, as they open in Excel. Under them the file has empty rows that are ready: the lists, the formulas and the colours are already set.

Sheet: Production report14 columns
DateShiftMachine or lineJob card and itemOperatorTargetMadeRejectedGood piecesShort byMinutes lostReasonAction byRemarks
9 Oct 2026DayPress 2 (63 ton)JC 412, Lakshya Auto Parts, bracket L-40Ramesh1,2001,21510fills itselffills itself
9 Oct 2026DayCNC 1JC 409, Trimurti Pumps, shaft 22 mmSalim1601186fills itselffills itself120Machine breakdownVinod: spindle belt changed, check it at shift startBalance to be made up today
9 Oct 2026NightPress 2 (63 ton)JC 415, Lakshya Auto Parts, clamp C-12Deepak1,50098020fills itselffills itself150Material shortPooja: 2 mm sheet to reach by noonSales told: one day late
9 Oct 2026DayWelding bayJC 407, Sunrise Furniture Works, chair frameArif90962fills itselffills itself
10 Oct 2026DayCNC 1JC 409, Trimurti Pumps, shaft 22 mmSalim208fills itselffills itselfTarget includes 48 pieces left from yesterday
Example rows with invented names. On a phone, slide the sheet sideways to see every column.
  • Red row: The good pieces are short of the target. Read the reason and the action.
  • Amber row: A target is written and the shift has not reported yet.
  • Green row: The target was met.

The columns, and what to write in each

  1. Date

    The production day.

  2. Shift

    Pick from the list. Change the list to your own shifts if you need to (Data, Data Validation).

    DayNightGeneral
  3. Machine or line

    The machine, line or bay, by the name used on the floor.

  4. Job card and item

    Job card number, party and item.

  5. Operator

    One name.

  6. Target

    Pieces planned for this shift, written before the shift starts.

  7. Made

    All pieces produced, good and bad.

  8. Rejected

    Pieces rejected or sent for rework.

  9. Good pieces

    Fills itself: made minus rejected.

  10. Short by

    Fills itself: target minus good pieces, when the shift fell short.

  11. Minutes lost

    Minutes the machine stood in this shift.

  12. Reason

    Pick from the list, so that reasons can be counted. Change the list to your own reasons if you need to.

    Material shortMachine breakdownPower cutOperator absentDrawing changeTool or dieChangeoverQuality problemOther
  13. Action by

    What will be done, and one name.

  14. Remarks

    Anything the next shift must know.

How to keep it

  1. At the start of the shift, write one row for each machine or line, with the job card, the operator and the target.
  2. Before leaving the floor, the supervisor fills in the pieces made, the pieces rejected and the minutes lost. "Good pieces" and "Short by" fill themselves.
  3. A red row needs a reason from the list and one name in "Action by". A short row without them is not complete.
  4. Morning: filter "Date" for yesterday and read the red rows first. If a job will miss its promised date, tell sales the same day.
  5. Once a week, count the minutes lost on each machine and how often each reason appears.

Also in the file: evening message

The evening message to the owner

Copy the lines below into a WhatsApp message at the end of the day and fill them from the rows of the day.

PRODUCTION (date)

Good pieces: (total) against a target of (total)

Short: (machine), (job card), short by (pieces). Reason: (reason). Action: (what, and who)

Machines that stood: (machine), (minutes) minutes, (reason)

Rejected: (item), (pieces), (why)

Jobs that will miss the promised date: (job card, party, new date)

The message to sales when a job will be late

Job card 415 for Lakshya Auto Parts (clamp C-12) will be late. Reason: 2 mm sheet was short. New date: (date). Please tell the customer today.

Take the daily production report with you

Free to use and to change. No macros, nothing to install.

Download the Excel file
The guide behind this format

Daily production report format in Excel for a factory

A daily production report format in Excel for a factory: fourteen columns, what to write in each, three rules, and how to read it each morning and each week.

5 min read

People also look for this as: daily production report format in Excel · daily production report format · production report for a factory · shift wise production report

When the sheet stops being enough

A sheet works while one or two people keep it. When staff must update from the godown or the road, and reminders must go out by themselves, the same columns become a system. Try it in your browser, without a sign-up.

Production Job Tracker: a sample screen of the system

Production Job Tracker

Orders & Operations

Job cards move from material to packing on one screen. A stuck job carries its reason, machines show running or down, and sales gets the new date on WhatsApp.

Try the demoFrom ₹25,000Open →
Questions
Is this daily production report format free?+

Yes. The download starts at once: no form, no email and no sign-up. Use it and change it for your own business.

Does the file have macros?+

No. It is a plain .xlsx file with dropdown lists, a few formulas and colour rules. There is nothing to install and nothing to switch on.

Why do the example rows show dates around today?+

The five example rows carry dates that move with today, so a file opened next month still shows how a late row looks. Type over the examples or delete them before you start.

Which program do I need to open it?+

It was made for Microsoft Excel on a computer and checked there. Other spreadsheet programs open .xlsx files too, but we have not checked the dropdown lists and the colours in each of them.

Can I change the columns?+

Yes. Rename a column, add your own, or change the choices of a dropdown list (Data, then Data Validation). The "How to use" sheet says what each column is for.