Job card format in Excel

One row per job card: party, item, quantity, promised date, stage and pieces done. A job past its date turns red, a job on hold or due in two days turns amber.

Download the Excel file.xlsx · 49 KB · 14 columns · no form, no email

What the file looks like

The heading row and the five example rows, as they open in Excel. Under them the file has empty rows that are ready: the lists, the formulas and the colours are already set.

Sheet: Job cards14 columns
Job card no.Date issuedPartyItem and drawingQuantityPromised dateStagePieces donePendingDays leftHold reasonNext action and whoSupervisorRemarks
JC 43111 Oct 2026Lakshya Auto PartsBracket L-40, drawing B-12 rev 22,40020 Oct 2026Machining1,500fills itselffills itselfRamesh: second shift on Press 2 tomorrowRamesh
JC 4288 Oct 2026Trimurti PumpsShaft 22 mm, drawing S-22 rev 130016 Oct 2026QC300fills itselffills itselfNeha: QC report by 11 am, dispatch the same daySalimCustomer called twice
JC 43313 Oct 2026Sunrise Furniture WorksChair frame CF-712022 Oct 2026On hold40fills itselffills itselfMaterial shortPooja: 25 mm pipe to reach tomorrowArif
JC 4255 Oct 2026Kaveri EngineeringFlange 4 inch, drawing F-4 rev 380015 Oct 2026Dispatched800fills itselffills itselfVinodShree Transport, LR 55821
JC 43516 Oct 2026Lakshya Auto PartsClamp C-12, drawing C-12 rev 11,50019 Oct 2026Material issued0fills itselffills itselfRamesh: start on Press 1 after JC 431Ramesh
Example rows with invented names. On a phone, slide the sheet sideways to see every column.
  • Red row: The promised date has passed and the job has not left. Tell sales today.
  • Amber row: The job is on hold, or it is due within two days. Read the next action.
  • Green row: The job has left the factory.

The columns, and what to write in each

  1. Job card no.

    One number per job, the same number as on the paper card on the floor.

  2. Date issued

    The day the job went to the floor.

  3. Party

    The customer, spelt the same way every time.

  4. Item and drawing

    Item name, drawing number and revision.

  5. Quantity

    Pieces ordered on this job card.

  6. Promised date

    The date given to the customer for dispatch.

  7. Stage

    Where the job is now. Pick from the list. Change the list to your own stages if you need to (Data, Data Validation).

    Material issuedCuttingMachiningFabricationAssemblyQCPackingDispatchedOn hold
  8. Pieces done

    Pieces finished at the current stage.

  9. Pending

    Fills itself: quantity minus pieces done at this stage.

  10. Days left

    Fills itself: days to the promised date. Below zero means the job is late.

  11. Hold reason

    Only for a job on hold. Pick from the list, so that reasons can be counted.

    Material shortMachine breakdownDrawing awaitedTool or dieQuality problemCustomer changeOther
  12. Next action and who

    What will move the job, and one name.

  13. Supervisor

    The person who updates this job card.

  14. Remarks

    Anything the next person must know. After dispatch: transporter and LR number.

How to keep it

  1. When an order goes to the floor, give it a job card number and write one row: party, item and drawing, quantity and the promised date.
  2. Every evening the supervisor sets the stage of each open job and the pieces done at that stage. "Pending" and "Days left" fill themselves.
  3. A job that cannot move is set to "On hold", with a reason from the list and one name in "Next action and who".
  4. Morning: sort by "Days left" and read the red rows, then the amber ones. Tell sales the same day when a promised date will be missed.
  5. When the goods leave, set the stage to "Dispatched" and write the transporter and LR number in "Remarks".

Also in the file: messages

The morning message to the owner

Copy the lines below into a WhatsApp message and fill them from the red and amber rows.

JOB CARDS (date)

Late: (job card, party, item), (days) days past the promised date. Stage: (stage). Next: (action, and who)

On hold: (job card), (reason). Next: (action, and who)

Due in two days: (job card, party), at (stage), (pending) pieces to go

Dispatched yesterday: (job card, party, LR number)

The message to a customer when a job will be late

Your order of clamps C-12 (our job card 435) will reach you on (new date), not (old date). Reason: (reason, in one line). We will send the LR number the day it leaves.

Take the job card register with you

Free to use and to change. No macros, nothing to install.

Download the Excel file
The guide behind this format

Job card format in Excel: one row per job, stage by stage

A job card format in Excel for a factory: fourteen columns, the stages from material issue to dispatch, three rules, and how to read it every morning.

6 min read

People also look for this as: job card format in Excel · job card format for a factory · production job card format · job card register

When the sheet stops being enough

A sheet works while one or two people keep it. When staff must update from the godown or the road, and reminders must go out by themselves, the same columns become a system. Try it in your browser, without a sign-up.

Production Job Tracker: a sample screen of the system

Production Job Tracker

Orders & Operations

Job cards move from material to packing on one screen. A stuck job carries its reason, machines show running or down, and sales gets the new date on WhatsApp.

Try the demoFrom ₹25,000Open →
Questions
Is this job card register format free?+

Yes. The download starts at once: no form, no email and no sign-up. Use it and change it for your own business.

Does the file have macros?+

No. It is a plain .xlsx file with dropdown lists, a few formulas and colour rules. There is nothing to install and nothing to switch on.

Why do the example rows show dates around today?+

The five example rows carry dates that move with today, so a file opened next month still shows how a late row looks. Type over the examples or delete them before you start.

Which program do I need to open it?+

It was made for Microsoft Excel on a computer and checked there. Other spreadsheet programs open .xlsx files too, but we have not checked the dropdown lists and the colours in each of them.

Can I change the columns?+

Yes. Rename a column, add your own, or change the choices of a dropdown list (Data, then Data Validation). The "How to use" sheet says what each column is for.