Job card format in Excel
One row per job card: party, item, quantity, promised date, stage and pieces done. A job past its date turns red, a job on hold or due in two days turns amber.
What the file looks like
The heading row and the five example rows, as they open in Excel. Under them the file has empty rows that are ready: the lists, the formulas and the colours are already set.
| Job card no. | Date issued | Party | Item and drawing | Quantity | Promised date | Stage | Pieces done | Pending | Days left | Hold reason | Next action and who | Supervisor | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| JC 431 | 11 Oct 2026 | Lakshya Auto Parts | Bracket L-40, drawing B-12 rev 2 | 2,400 | 20 Oct 2026 | Machining | 1,500 | fills itself | fills itself | Ramesh: second shift on Press 2 tomorrow | Ramesh | ||
| JC 428 | 8 Oct 2026 | Trimurti Pumps | Shaft 22 mm, drawing S-22 rev 1 | 300 | 16 Oct 2026 | QC | 300 | fills itself | fills itself | Neha: QC report by 11 am, dispatch the same day | Salim | Customer called twice | |
| JC 433 | 13 Oct 2026 | Sunrise Furniture Works | Chair frame CF-7 | 120 | 22 Oct 2026 | On hold | 40 | fills itself | fills itself | Material short | Pooja: 25 mm pipe to reach tomorrow | Arif | |
| JC 425 | 5 Oct 2026 | Kaveri Engineering | Flange 4 inch, drawing F-4 rev 3 | 800 | 15 Oct 2026 | Dispatched | 800 | fills itself | fills itself | Vinod | Shree Transport, LR 55821 | ||
| JC 435 | 16 Oct 2026 | Lakshya Auto Parts | Clamp C-12, drawing C-12 rev 1 | 1,500 | 19 Oct 2026 | Material issued | 0 | fills itself | fills itself | Ramesh: start on Press 1 after JC 431 | Ramesh |
- Red row: The promised date has passed and the job has not left. Tell sales today.
- Amber row: The job is on hold, or it is due within two days. Read the next action.
- Green row: The job has left the factory.
The columns, and what to write in each
- Job card no.
One number per job, the same number as on the paper card on the floor.
- Date issued
The day the job went to the floor.
- Party
The customer, spelt the same way every time.
- Item and drawing
Item name, drawing number and revision.
- Quantity
Pieces ordered on this job card.
- Promised date
The date given to the customer for dispatch.
- Stage
Where the job is now. Pick from the list. Change the list to your own stages if you need to (Data, Data Validation).
Material issuedCuttingMachiningFabricationAssemblyQCPackingDispatchedOn hold - Pieces done
Pieces finished at the current stage.
- Pending
Fills itself: quantity minus pieces done at this stage.
- Days left
Fills itself: days to the promised date. Below zero means the job is late.
- Hold reason
Only for a job on hold. Pick from the list, so that reasons can be counted.
Material shortMachine breakdownDrawing awaitedTool or dieQuality problemCustomer changeOther - Next action and who
What will move the job, and one name.
- Supervisor
The person who updates this job card.
- Remarks
Anything the next person must know. After dispatch: transporter and LR number.
How to keep it
- When an order goes to the floor, give it a job card number and write one row: party, item and drawing, quantity and the promised date.
- Every evening the supervisor sets the stage of each open job and the pieces done at that stage. "Pending" and "Days left" fill themselves.
- A job that cannot move is set to "On hold", with a reason from the list and one name in "Next action and who".
- Morning: sort by "Days left" and read the red rows, then the amber ones. Tell sales the same day when a promised date will be missed.
- When the goods leave, set the stage to "Dispatched" and write the transporter and LR number in "Remarks".
Also in the file: messages
Copy the lines below into a WhatsApp message and fill them from the red and amber rows.
JOB CARDS (date)
Late: (job card, party, item), (days) days past the promised date. Stage: (stage). Next: (action, and who)
On hold: (job card), (reason). Next: (action, and who)
Due in two days: (job card, party), at (stage), (pending) pieces to go
Dispatched yesterday: (job card, party, LR number)
Your order of clamps C-12 (our job card 435) will reach you on (new date), not (old date). Reason: (reason, in one line). We will send the LR number the day it leaves.
Free to use and to change. No macros, nothing to install.
Job card format in Excel: one row per job, stage by stage
A job card format in Excel for a factory: fourteen columns, the stages from material issue to dispatch, three rules, and how to read it every morning.
People also look for this as: job card format in Excel · job card format for a factory · production job card format · job card register